Designing disassembly of built structures and turning the construction waste to a valuable resource.
Long description
The main focus of this project is on 2 main objectives:
- To reduce the Construction Waste going to the landfills.
- To create a system of designing buildings that are easy to dismantle.
The challenge is to dismantle the dilapidated buildings in such a manner that most of the building elements can be refurbished and reused. The process shall include designing the journey of every element that is dismantled in a building and segregating of the building elements as per the Rs applicable. In the process of designing and segregation, the team will be collaborating with various other experts / agencies such as:
- Architects: To design the treatment proposed for every element of the building.
- Structural Consultants: To design stepwise dismantling of the structural members.
- Quality Testing Laboratories: To test the structural stability of the recycled elements.
- Manufacturers: Damaged items such as broken windows, nonworking AC units, etc can be sent to the manufacturing unit. Further, its parts can be utilized as a raw material for a new unit or the items can be repaired and sold in a recycled market.
- Product Designers: Many of the elements in the building can be redesigned and reused for a different purpose.
- Contractor, Site Supervisor and Labors : Site execution team.
- Transportation companies: Goods to be transported to recycling plants, manufacturing units, markets, etc. will be carried by registered agencies to optimize the transportation.
- Warehouse Agencies: For storage of materials.
- Software experts: To manage the data base and track the system.
Please login or create a profile to view comments